Put both finished floor levels on the transition drawing
Provide both finished floor levels when reviewing a transition between existing and proposed surfaces.
A new floor finish is thicker than the old one, leaving a change in level at the doorway. Before ordering a trim, give the designer the two finished levels and the complete transition. The U.S. Access Board's floor-surface guide addresses changes in level, including thresholds and carpet trim on accessible routes.
Record the actual proposed materials and the installation buildup. Ask the contractor to show the finished levels on a drawing, rather than compare only the thickness of loose samples. Include the location and direction of travel so the responsible professional can review the relevant requirements and decide the appropriate detail.
For example, a room may receive new flooring while the corridor remains unchanged. A catalog trim that appears suitable for the material's nominal thickness may not describe the installed difference. Have the designer review the finished arrangement and identify what product or construction detail is required before the supplier selects a profile.
The Access Board describes different treatment for level changes, including a requirement to address changes above a half inch as a ramp or curb ramp, or a walkway where the stated slope can be achieved. The professional should apply the actual provisions and other relevant requirements to the project, rather than treat a small trim as the answer to every height difference.
Keep installation and procurement decisions connected. Record the chosen transition detail, the drawing revision and the exact product if one is specified. If the flooring buildup changes, bring the new levels back for review. A substitution underneath the finish can affect the final surface even when the visible flooring model stays the same.
The ADA Standards have defined applications, and an ordinary private-home project may involve different governing rules. Individual mobility needs and local requirements deserve appropriate advice too. Use the guide to identify the technical issue, then retain the project-specific decision and responsibilities for checking the installed work.
In the shop or supplier catalog, compare the trim or materials named by the reviewed detail, with accurate dimensional information and installation instructions. Confirm what the quotation includes. Keep the final drawing with the order and completion records. This gives the installer a precise transition to construct and the owner a useful reference when the floor is repaired or replaced later.
Sources and further reading
- Chapter 3: Floor and Ground Surfaces · Read 2026-11-10
- Chapter 3: Clear Floor or Ground Space and Turning Space · Read 2026-11-10
This is general information. Check the relevant authority or manufacturer for the rules, compatibility and terms that apply to your situation.